After recent roadworks the curbing on Charles St has been moved further out from the front of the property and has left a hole exposing reticulation and leaving the edge of the grass exposed which is causing it to die.
This piece of work is to repair /relocate the reticulation and fill in the hole so the grass can grow out to the edge of the curb.
Charles St verge repairs after roadworks
Re: Charles St verge repairs after roadworks
Work Completed
Tasks Completed:
- Removed dumped cement from grass area
- Repaired reticulation/repositioned sprinklers to new edge of grass area
- Filled in hole between grass and curb with new soil (20 wheelbarrows)
- Applied dynamic lifter to new soil
- Tested reticulation
- Watered in soil/dynamic lifter
Cost: $242
Tasks Completed:
- Removed dumped cement from grass area
- Repaired reticulation/repositioned sprinklers to new edge of grass area
- Filled in hole between grass and curb with new soil (20 wheelbarrows)
- Applied dynamic lifter to new soil
- Tested reticulation
- Watered in soil/dynamic lifter
Cost: $242