Problem: Debris left after hail storm on paths and walkways. A large amount of soil was washed onto pathways in some sections (up to 70mm thick)
Solution: Soil was removed with shovels then broomed and washed.
Completed: 22/03/2009
Work Performed by: MCS
Attachment:
20100322_183746_resize.jpg [ 59.51 KiB | Viewed 14035 times ]
Attachment:
20100322_183722_resize.jpg [ 42.93 KiB | Viewed 14035 times ]
Attachment:
20100323_172206_resize.jpg [ 44.27 KiB | Viewed 14035 times ]
Attachment:
20100323_172123_resize.jpg [ 40.82 KiB | Viewed 14035 times ]
Attachment:
20100323_172309_resize.jpg [ 36.73 KiB | Viewed 14035 times ]