Over the coming months a new letterbox system will be installed on the fence line in the area next to the north pedestrian gate.

The following tasks will need to be completed:
  • Removal of the brick sign.
  • Preparation of the area.
  • Installation of new letterbox system.
  • Installation of new fencing around letterboxes.
  • Concreting of area around new letterboxes.
  • Removal and cleanup of old letterbox area.


Attachments:
20140408_155012.jpg
20140408_155012.jpg [ 317.37 KiB | Viewed 13477 times ]
Top
   
PostPosted: Mon May 05, 2014 8:55 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
23/04/2014 : Brick sign was removed.

/viewtopic.php?t=764


Attachments:
20140423_091555.jpg
20140423_091555.jpg [ 460.57 KiB | Viewed 13478 times ]
20140423_135654.jpg
20140423_135654.jpg [ 670.14 KiB | Viewed 13478 times ]
Top
   
PostPosted: Sun May 11, 2014 11:20 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
05/05/2014 : Over 5 tonnes of soil was removed from the area to allow the section against the fence to be close to street level.

Unfortunately works had to be stopped as a large tree stump was discovered under the ground level.


Attachments:
20140504_093253.jpg
20140504_093253.jpg [ 100.83 KiB | Viewed 13478 times ]
Top
   
PostPosted: Sat May 17, 2014 5:54 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
10/05/2014 : Soil and many of the roots were cleared from around the stump to allow it to be cut out.


Attachments:
20140510_142209.jpg
20140510_142209.jpg [ 546.18 KiB | Viewed 13478 times ]
Top
   
PostPosted: Sat May 17, 2014 5:59 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
17/05/2014 : Tree stump was removed and taken to the tip. Note that the tree stump and root system weighed over 1.2 tonnes when dumped at the tip.


Attachments:
20140517_172923.jpg
20140517_172923.jpg [ 505.95 KiB | Viewed 13478 times ]
Top
   
PostPosted: Tue May 27, 2014 5:44 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
26/05/2014 : Re-leveling of area has been completed.


Attachments:
20140527 155619.jpg
20140527 155619.jpg [ 575.81 KiB | Viewed 13687 times ]
Top
   
PostPosted: Sat May 31, 2014 12:20 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
28/05/2014 : Letterbox system has been ordered (lead time is 4-8 weeks)

Letterboxes will be Clear Anodised (as we are concerned about graffiti)
Numbering Strips will be black with light (off-white) lettering.


Top
   
PostPosted: Mon Aug 04, 2014 11:19 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
Hi All,

It is will sadness that I relay the following:

Simon, the representative that had been assisting with this project passed away in mid June this year.

I have been speaking to Simon regarding this project for a number of years and I believe it was a surprise to everyone when he passed.

Our thoughts are with his wife Anna and family.

Unfortunately this has delayed the project somewhat and we are now working out when installation can take place.

Saxon


Top
   
PostPosted: Thu Oct 02, 2014 5:09 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
Installation was scheduled to complete this week however the contractor canceled.

We are now looking at next week for installation.


Top
   
PostPosted: Mon Oct 06, 2014 10:09 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
The company attempted to install the letterboxes but found them too heavy to unstall without a crane.

Feedback from contractor:

"I had to cancel install for today. After our pre-install visit this morning and looking at it all, we don’t think it is safe to manually manoeuvre in this situation, as the boxes are so heavy. We have a contractor who has a crane on his truck. I will need to book him in next week.

Apologies for the cancellation."


Top
   
PostPosted: Wed Nov 12, 2014 10:57 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
08/11/2014 : New letterbox system was installed.

Note: the new letterboxes will not be in use until the fence and path have been modified.


Attachments:
20141108 085017.jpg
20141108 085017.jpg [ 360.17 KiB | Viewed 13687 times ]
20141108 090127.jpg
20141108 090127.jpg [ 315.31 KiB | Viewed 13687 times ]
Top
   
PostPosted: Fri Jan 16, 2015 8:06 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
28/11/2014

New concrete path to letterboxes has been completed.

Note that letterboxes will not become active until signs and fencing are completed.


Attachments:
20141128_124015.jpg
20141128_124015.jpg [ 332.16 KiB | Viewed 13687 times ]
20141128_161453.jpg
20141128_161453.jpg [ 320.48 KiB | Viewed 13687 times ]
Top
   
PostPosted: Sun Feb 08, 2015 4:33 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
15/01/2015

We have received notice that the address and no junk mail signs for the letterboxes will be installed over the next 2-3 weeks.

Once this occurs we will allow the letterboxes to be used and start the process to have the fence fixed.


Top
   
PostPosted: Sun Feb 08, 2015 6:29 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
30/01/2015

The address and junk mail signs have been installed and the letterboxes are now ready for use.

The old letterboxes will be demolished and removed after March 1st 2015.

All residents will be notified by email and a notice in the new and old mailbox.


Top
   
PostPosted: Fri Feb 13, 2015 7:33 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
Communications have been sent out advising residents to start using the new letterboxes and to make sure all mail is removed from the old letterboxes by March 1st.

Old letterboxes will be demolished as soon as the fencing around the new letterboxes has been completed.

More information on communication is available here:
/viewtopic.php?t=899


Top
   
PostPosted: Wed May 06, 2015 9:42 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
06/05/2015 : Fencing around the new letterboxes has been installed

The new letterboxes are now in use, the old letterboxes have been taped off.


Attachments:
20150506_151547.jpg
20150506_151547.jpg [ 2.22 MiB | Viewed 13554 times ]
20150516_083117.jpg
20150516_083117.jpg [ 774.62 KiB | Viewed 13515 times ]
Top
   
PostPosted: Thu May 07, 2015 9:45 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
Tasks still to be completed (with estimated completion dates):

2015/05 : concreting around new fencing
2015/05 : demolition/cleanup of old letterbox area


Top
   
PostPosted: Fri Jun 05, 2015 8:30 am 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
02/06/2015 : concreting around new fencing completed


Attachments:
20150605_073543.jpg
20150605_073543.jpg [ 2.21 MiB | Viewed 13483 times ]
Top
   
PostPosted: Sat Jun 20, 2015 12:27 pm 
Site Admin

Joined: Tue Jan 06, 2009 5:53 pm
Posts: 2701
Demolition of old letterboxes has been completed

Note that a bottle and note was found sealed inside the old letterboxes
/viewtopic.php?t=928


Attachments:
20150516_083046.jpg
20150516_083046.jpg [ 92.16 KiB | Viewed 13459 times ]
20150517_103854.jpg
20150517_103854.jpg [ 121.24 KiB | Viewed 13459 times ]
20150618_171336.jpg
20150618_171336.jpg [ 72.83 KiB | Viewed 13459 times ]
Top
   
Display posts from previous:  Sort by  
Post new topic  Reply to topic  [ 19 posts ] 

All times are UTC+08:00


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Limited